Project

Zentrum am Berg

Unmatched efficiency in removing sediment

In this project supported by the European Commission Robotics for Infrastructure Maintenance and Automation programme, the DrainBot system showed unmatched efficiency in removing sediment and maintaining drainage pipe status. While the efficiency seems to vary with the type and the age of sediment and the frequency of maintenance of each single segment of the pipe, our technology offers a long-lasting solution for tunnel operators to reduce locking times while keeping their drainage systems operating at the optimum of their efficiency.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Details

Project Information

Service

Lorem ipsum

Period

Lorem ipsum

Client

Lorem ipsum

Project costs

Lorem ipsum

Scroll to Top